Sunday, April 7, 2013

Getting somewhere

A lot more work goes into laying a cement foundation than I ever thought. First Mr. E had to pack down all the dirt, using a handy dandy machine.  He had tried to dig the footers before packing it down and it was just caving in.  After all the footers were dug, which were all done by hand by Mr. E, he put it all the re-bar for reinforcement.  He then drove spikes into the existing foundation to tie the new and the old together so the two buildings don't separate.  After all that preparation, the cement finally arrived yesterday.  We had some concrete guys come and do the actual finishing work.  We now have a cement slab and we can be begin to put the walls up.  Finally, it looks like we are getting somewhere.  I really shouldn't say "we", Mr. E has done the majority of the work with some help from people other than me.  I'm amazed at how well he did everything, considering this is all new to him.  The concrete guys even offered him a job, they'd never seen a more perfect job. That's my man!